Offshore wind reference list
The Port of Thyboron has been used by the offshore wind industry in numerous ways since 2016. Below is a list of offshore wind farms for which the Port of Thyboron has been used for both installation tasks and O&M. The port is also used for mobilising offshore vessels and sometimes for layovers.
Thor – installation in 2026
- Geophysical surveys
- Marine archaeology
- UXO activities
- Seabed mapping
- Trafos - Heavy lift operation
- Construction Base Port including MCC
- Marshalling Port Thor SSt
- Commissioning Port - OEM - Turbine installation
Vesterhav Nord – installation in 2023
- Geophysical surveys
- Seabed preparation
- Geological survey
- Trafos - Heavy lift operation
- Marshalling Port for Foundation installation
- Scour protection
- Survey, boulder clearance, PLGR for cable installation
- O&M Vesterhav N
Nissum Bredning Offshore Test Wind Farm – 7 MW offshore vindmøller – Installeret i 2017
- Geophysical surveys
- Seabed preparation
- Geological survey
- Dredging
- Seabed preparation
- Onshore storage of piles and jackets
- Short-term floating storage of concrete TP´s and following main components tower, blade and nacelles.
- Jacket installation
- Transition piece installation
- Wind turbine construction
- Cable installation
- O&M
Horns Rev 3 – Installation in 2018
- DP vessel
- Seabed preparation work




Thor – Installation i 2026




Vesterhav Nord – Installation i 2023




Nissum Bredning Offshore Test havvindmøllepark





Nissum Bredning Havvindmøllepark
Nissum Bredning Vind bringer offshore innovationer til live